How it works
Calculate bank excavation volume, loose volume after bulking and estimated truck loads.
Core method:
Bank volume = length × width × depth. Loose volume = bank volume × (1 + bulking). Loads are rounded up.
Bank volume = length × width × depth. Loose volume = bank volume × (1 + bulking). Loads are rounded up.
Before you use the result: Check project drawings, supplier data and site conditions before ordering materials.